Case Study

Full House Plaster and Paint in Wisbech

Introduction

Objective: To rejuvenate the entire house interiors with fresh plastering and painting, leading to a modern, sleek, and cohesive aesthetic throughout the property.


Project Planning and Design

Initial Consultation:

Customer approached us with the aim of giving their dated interiors a complete makeover. Their key requirements included:

- The walls and ceilings required fresh plastering to achieve a smooth, even finish.

- Applying high-quality, durable white paint

- Ensuring minimal disruption during the renovation due to their occupancy.

Design Proposal:

A detailed design proposal was crafted, agreeing upon:

- Extensive preparation of all wall and ceiling surfaces to ensure a flawless base for the new plaster.

- Selection of premium quality plaster and paints for durability and aesthetic appeal.

- A neutral yet warm color scheme to enhance natural light and space perception.

- Phased approach to minimize inconvenience, prioritizing living areas sequentially.

Approach

Construction Phase

Preparation and Initial Work.

1. Setup:

- Commenced with a thorough site setup, including protective coverings for flooring, furniture, and other fixtures to safeguard against dust and paint splatters.

2. Surface Assessment and Repair:

- Conducted a comprehensive assessment of all walls and ceilings to identify cracks, holes, and any other defects.

- Repaired damaged areas to create an even surface for new plaster application.

Plastering:

1. Initial Layer:

- Applied a base coat of plaster to all walls and ceilings, ensuring it adhered smoothly. This step was crucial for creating a sound foundation.

- Followed up with a finishing coat, meticulously smoothing it out to eradicate any irregularities.

- Ensured detailed finishing along edges, corners, and around fixtures for a professional look.

Painting:

1. Surface Preparation:

- Post plaster drying, surfaces were sanded down to achieve an ultra-smooth finish.

- Primed all walls and ceilings to enhance paint adhesion and longevity.

2. Application:

- Applied two coats of a paint

- Each coat was allowed to dry completely before the next application, ensuring even coverage and a lasting finish.

Final Touches and Completion

Quality Inspection:

- Conducted a thorough walkthrough with the customer to ensure every detail met their expectations.

- Addressed any minor touch-ups and ensured all protective materials were removed, leaving the home spotless.

Finishing Touches:

- Reinstalled any displaced fixtures and fittings.

- Ensured all new plaster and paintwork harmonized perfectly, providing a fresh, cohesive aesthetic throughout the house.

Results

The project was completed successfully, well within the stipulated timeline and budget.